diff options
author | Armin Kuster <akuster808@gmail.com> | 2018-12-12 02:21:03 +0000 |
---|---|---|
committer | Armin Kuster <akuster808@gmail.com> | 2018-12-31 09:01:46 -0800 |
commit | 61f0fbff0281aeac8161f9932dfb6a9d694de6a6 (patch) | |
tree | 50fb9935da720dae0f76b1beca40f6e3f8343e83 /meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch | |
parent | 80aa876b7f5b4304fbc2321795913b0c6424ac08 (diff) | |
download | meta-openembedded-contrib-akuster/master-wip.tar.gz |
drbd: update to 9.0.16akuster/master-wip
Signed-off-by: Armin Kuster <akuster808@gmail.com>
Diffstat (limited to 'meta-multimedia/recipes-mediacenter/kodi/kodi-17/0001-change-order-of-detecting-libegl-and-libgles2.patch')
0 files changed, 0 insertions, 0 deletions